Upper Wardha Major Irrigation Project JI00465

From
Jump to: navigation, search
« Go Back
Associated Relationships with Project
Sl.No.Name
1Upper Wardha Dam

Explore in Water Resources Projects Sub Info. System

Salient Features
Name of the Irrigation ProjectUpper Wardha Major Irrigation Project
Type of projectMajor
Engineering Type of ProjectLift,Storage
Purpose of Project Irrigation
Name of the River Wardha
Status Completed
StateMaharashtra
Inter-Basin ProjectNo
BasinGodavari
International Sharing None
Project Sharing (International/Interstate/Both) None
Plan (Five Year Plan) - Start IV
Plan (Five Year Plan) - EndXI
Project Approved by Planning Commission (Yes/No)Yes
Approved by Planning commission (Year)1976
Approved Cost by Planning Commission 39.88
Culturable Command Area (CCA) (Th ha)83.3
Gross Command Area (GCA) (Th ha)104.4
Potential Utilized (Th ha).2
Net Irrigated Area(NIA) (Th ha) 70.169
District/s BenefittedAmrawati, Wardha
Project Covered under ERM Scheme No
Project Covered under CADA SchemeYes
Project Covered under AIBP SchemeYes
Project cover under DPAPY
Ultimate Irrigation Potential (Th ha)80.25

Project in Brief

The Upper Wardha Project is located on river Wardha, Godavari basin in Amravati district of Maharashtra. The project has following components

  1. 5588.50 m long earthen dam with maximum height of 39.90 m and 331.50 m long concrete dam with 240.50 m long central spillway with maximum height of 46.20 m and non over flow blocks of 91 m length across river Wardha near Simbhora village, Tehsil Morshi of Amravati district. The reservoir created will have gross storage capacity of 678.27 MCM and live storage capacity of 564.05 MCM.
  1. 240.50 m long gated ogee shaped central spillway with 13 radial gates of size 15m x 12m to pass designed flood of 19.57 cubic meter/sec.
  2. 42.40 km long left bank canal and 95.50 km long right bank canal having discharge capacity of 10.42 cumec/second and 37.00 cumec/second respectively

The project was approved by planning commission in May 1976 for an estimated cost of 39.88 crore with potential of 75080 ha and CCA 83330. The project will also provide 79.719 million cubic meter water for domestic use.
The project was started in the year 1976 and is completed during XI five- year plan and full irrigation potential has been created. Total expenditure on the project is Rs 978.75 crore upto end of XI plan.