Upper Wardha Major Irrigation Project JI00465

Jump to: navigation, search
« Go Back

Salient Features
1Irrigation Project NameUpper Wardha Major Irrigation Project
2Purpose of Project Irrigation
3Type of ProjectMajor
4Engineering Type of ProjectLift,Storage
5Status Completed
7Districts BenefittedAmrawati, Wardha
9River Wardha
10Tributary Wardha
11 Project Sharing (International/Interstate/Both) None
12International Sharing None
14Year of Start of Work-
15Work Started in 5 Year PlanIV
16Year of Completion of Work -
17Work Completed in 5 Year PlanXI
18Project Approval StatusPC
19Year of Approval by Planning Commission 1976
20Approved Cost (Rs. Crore) 39.88
21Actual Cost(Rs Crore) -
22Culturable Command Area (CCA) (Th ha)83.3
23Ultimate Irrigation Potential (Th ha)80.25
24Potential Created(Th ha)-
25Project Covered under ERM Scheme No
26Project Covered under CADA SchemeYes
27Project Covered under AIBP SchemeYes
28Studies Conducted-
29Project Covered under Tribal Sub-planYes
29Project cover under DPAPYes
Associated Relationships with Project
1Upper Wardha Dam

Explore in Water Resources Projects Sub Info. System

Project in Brief

The Upper Wardha Project is located on river Wardha, Godavari basin in Amravati district of Maharashtra. The project has following components

  1. 5588.50 m long earthen dam with maximum height of 39.90 m and 331.50 m long concrete dam with 240.50 m long central spillway with maximum height of 46.20 m and non over flow blocks of 91 m length across river Wardha near Simbhora village, Tehsil Morshi of Amravati district. The reservoir created will have gross storage capacity of 678.27 MCM and live storage capacity of 564.05 MCM.
  1. 240.50 m long gated ogee shaped central spillway with 13 radial gates of size 15m x 12m to pass designed flood of 19.57 cubic meter/sec.
  2. 42.40 km long left bank canal and 95.50 km long right bank canal having discharge capacity of 10.42 cumec/second and 37.00 cumec/second respectively

The project was approved by planning commission in May 1976 for an estimated cost of 39.88 crore with potential of 75080 ha and CCA 83330. The project will also provide 79.719 million cubic meter water for domestic use.
The project was started in the year 1976 and is completed during XI five- year plan and full irrigation potential has been created. Total expenditure on the project is Rs 978.75 crore upto end of XI plan.

Upper Wardha Map.jpg