Upper Sileru Project Power House PH01473

From
Jump to: navigation, search
« Go Back
Associated Entities with Powerhouse
#NameType
1Guntanwada Weir (Forbay Dam)BWA
2Upper Sileru Hydroelectric ProjectHydro Electric Project

India WRIS Map view



Salient Features
#AttributeValue
1Name of PowerhouseUpper Sileru Project Power House
2Name of Powerhouse Alias
3StateAndhra Pradesh
4BasinGodavari
5Hydroelectric BasinEast Flowing Rivers
6Seismic ZoneSeismic Zone-II
7Hydroelectric Development TypeStorage
8Structure TypeDam
9Position of PowerhouseOthers
10TypeSurface
11Status of PowerhouseOperational
12Completion Year1995
13Pumped StorageNo
14Operating & Maintainance Agency
15Net Maximum/ Minimum Head (m)stg1:94/88.54 stg2:94/87
16MDDLMinimum Draw Down Level for Powerhouse (m)406.3
17Annual Design Energy (MU)528
18Firm Power (MW)58
19No. of Turbines4
20Capacity per Turbine (MW)60
21Total Installed Capacity (MW)240
22Head Class of TurbineMedium (Between 15 - 60 m)
23Water Conductor System (km)1
24Type of TurbineFrancis
25Turbine MakeStg 1 Charmillies- Switzerland and Stg 2 BHEL
26Rated Head (m)90
27Specific Speed (mhp)
28Rated Speed (rpm)187.5
29Generator MakeStg 1: Oerlikon-Switzerland and Stg 2: BHEL
30No. of Penstock4
31Length of Penstock (m)
32Penstock Size (m) - Internal Diameter5.64
33Design Discharge through each Penstock (cumec)-Flow91
34RemarksDam location is Surface. Power house location is:
4 units in 1967, 1968, 1994 and 1995. No. of
turbines: (Stg 1: 2; Stg2: 2). PH rated: 90 (Stg
1) and 90.5 (Stg 2). PH_sp_speed: Stg 1: 187.5;
stg 2: 200
Personal tools
Namespaces
Variants
Actions
Navigation
Topics
Toolbox

Either scripts and active content are not permitted to run or Adobe Flash Player version 10.0.0 or greater is not installed.

Get Adobe Flash Player