Teesta-III Power House PH01609
From
# | Name | Type |
---|---|---|
1 | Teesta-III Dam | DAM |
2 | Teesta-III HE Project | Hydro Electric Project |
India WRIS Map view
# | Attribute | Value |
---|---|---|
1 | Name of Powerhouse | Teesta-III Power House |
2 | Name of Powerhouse Alias | |
3 | State | Sikkim |
4 | Basin | Brahmaputra |
5 | Hydroelectric Basin | Brahamaputra Basin |
6 | Seismic Zone | Seismic Zone-IV |
7 | Hydroelectric Development Type | Run of the River |
8 | Structure Type | |
9 | Position of Powerhouse | |
10 | Type | |
11 | Status of Powerhouse | Under Construction |
12 | Completion Year | 2012 |
13 | Pumped Storage | |
14 | Operating & Maintainance Agency | |
15 | Net Maximum/ Minimum Head (m) | |
16 | MDDLMinimum Draw Down Level for Powerhouse (m) | |
17 | Annual Design Energy (MU) | 5228 |
18 | Firm Power (MW) | 225 |
19 | No. of Turbines | 6 |
20 | Capacity per Turbine (MW) | 200 |
21 | Total Installed Capacity (MW) | 1200 |
22 | Head Class of Turbine | |
23 | Water Conductor System (km) | 13824 |
24 | Type of Turbine | Pelton |
25 | Turbine Make | Andritz Hydro |
26 | Rated Head (m) | 780.33 |
27 | Specific Speed (mhp) | 2.589 RPM |
28 | Rated Speed (rpm) | |
29 | Generator Make | Andritz Hydro |
30 | No. of Penstock | 2 |
31 | Length of Penstock (m) | |
32 | Penstock Size (m) - Internal Diameter | 4 m Diameter |
33 | Design Discharge through each Penstock (cumec)-Flow | |
34 | Remarks |