Pamba Major Irrigation Project JI02671

From
Jump to: navigation, search
« Go Back
Salient Features
#AttributeValue
1Irrigation Project NamePamba Major Irrigation Project
2Irrigation Project Name Alias
3PurposeIrrigation
4TypeMajor
5Engineering TypeDiversion, Storage
6StatusCompleted
7StateKerala
8Districts BenefitedAlappuzha,Pathanamthitta
9BasinWest flowing rivers from Tadri to Kanyakumari
10RiverPamba
11Project SharingNone
12IntercountryNone
13InterbasinNo
14Work Started in 5 Year PlanIII-Plan
15Completed in 5 Year PlanVIII-Plan
16Project Approval StatusPlanning Commission
17Year of Approval by Planning Commission1964
18Approved Cost (Rs. in cr)3.83
19Actual Cost (Rs. in cr)65.39
20Culturable Command Area (CCA) (th ha)21.13
21Ultimate Irrigation Potential (UIP) (th ha)41.68
22Potential Created (PC) (th ha)20.72
23Project Covered under ERM SchemeNo
24Project Covered under CADA SchemeNo
25Project Covered under AIBP SchemeNo
26Studies Conducted
27Project Covered under Tribal Sub-Plan
28Project Covered under Drought Prone Area Programme (DPAP)
29Remarks

Associated Entities with Irrigation Project
#NameType
1Maniyar BarrageBarrage/ Weir/ Anicut (BWA)
2Pamba (Eb) DamDam
Explore in Water Resources Projects Sub Info. System

Introduction

The Pamba Irrigation project in Pattanamthitta district aims at the utilization of the tail race water of Sabarigiri Hydro Electric project for irrigation purpose. The tail race water is let into the river Kakkad and is picked up at Maniyar by a barrage. The water thus collected is diverted through a canal on the left bank of the river. The project was declared completed during 1993.

Project potential is 21135 Ha (CCA) in Ranni , Kozhenchery, Mollappilly and Thiruvalla in Pathanamthitta district and Chengannoor, Mavelikkara, Karthikappilly and Kayamkulam in Alapuzha district. The ayacut is generally on the right and left bank of river Pamba which is in between the rivers of Manimala and Achancoil on the right and left respectively and in tail reaches it covers Onattukara and eastern fringes of paddy field in Kuttanad of Kerala. The project consists of a barrage of length 115.22m with FRLFull Reservoir Level at 34.62m. Details of canals are given below.

Main canal26 km
Right bank canal 26.23 km
Right bank distributory 33.78 km
Left bank canal 47.15 km
Left bank distributory 190.59 km

Techno-Economic Appraisal

The project approval of Planning Commission in the year 1964 for an estimated cost of Rs 3.83 crore. The revised estimate of the project approval of Planning Commission in the year 1975 for an estimated cost of Rs 20.16 crore. Further revised estimate of Rs 42.97 crore received approval of Planning Commission in the year 1981, with CCA as 17806 hectare and potential as 41682 hectare.