#AttributeValue
1Irrigation Project NameChimony Major Irrigation Project
2Irrigation Project Name Alias
3PurposeIrrigation
4TypeMajor
5Engineering TypeStorage
6StatusCompleted
7StateKerala
8Districts BenefitedThrissur
9BasinWest flowing rivers from Tadri to Kanyakumari
10RiverChimoni
11Project SharingNone
12IntercountryNone
13InterbasinNo
14Work Started in 5 Year PlanV-Plan
15Completed in 5 Year PlanVIII-Plan
16Project Approval StatusPlanning Commission
17Year of Approval by Planning Commission1975
18Approved Cost (Rs. in cr)36.15
19Actual Cost (Rs. in cr)56.92
20Culturable Command Area (CCA) (th ha)13
21Ultimate Irrigation Potential (UIP) (th ha)25
22Potential Created (PC) (th ha)25
23Project Covered under ERM SchemeNo
24Project Covered under CADA SchemeNo
25Project Covered under AIBP SchemeNo
26Studies ConductedEIA
27Project Covered under Tribal Sub-PlanNo
28Project Covered under Drought Prone Area Programme (DPAP)
29RemarksStabilzes in 14.5 Thousand ha and additional
potential creation is 10.5 Thousand ha

Associated Entities with Irrigation Project
#NameType
1Chimoni (Id) DamDam

Explore in Water Resources Projects Sub Info. System

Project Description

The Chimoni irrigation project is constructed across river chimony, a tributary of river Karuvannur at Echippara in Trichur district of Kerala. The CCA of the project is 13,000 hectare ( 11,000 hectare of Kole land which is below sea level and 2000 hectare of other land) and GCA is 35,700 hectare. The project stabilizes irrigation in an area of 14,500 hectare and provides irrigation to an additional area of 10,500 hectare. Paddy is the main cultivation in the land. The main components of the project are as under:

  1. Masonry cum earthen dam 1211.5 meter long across river Chimoni.
  2. Four radial type spillway shutters of 10 x 4.25 meter.
  3. There is no independent canal system under this project. The already existing canals and natural drains carry irrigation water to the existing ayacut.

Techno-Economic Appraisal

The project received investment clearance of Planning commission in the year 1990 for an estimated cost of Rs 36.15 crore (1988 price level). The project was started in the year 1975 and has been completed during VIII plan.

Image Gallery

Personal tools
Namespaces
Variants
Actions
Navigation
Topics
Toolbox

Either scripts and active content are not permitted to run or Adobe Flash Player version 10.0.0 or greater is not installed.

Get Adobe Flash Player